Buffalo Public Housing Tenants Move to Form Union Over Repair Delays and Safety Concerns
Tenants of the Buffalo Municipal Housing Authority, known as BMHA, are working to form a tenants union. They say they have raised complaints about repairs and safety for years and that the authority has been slow to respond. WKBW in Buffalo reported on November 19, 2026 that tenants attended a BMHA meeting on Thursday to share their concerns in front of board members.
The effort is led by John Washington of the Buffalo Tenant Union and the Tenant Union Federation, according to the station. The authority's board chair responded by saying she wants to find where the delays come from, and she pointed to the authority's maintenance spending and new police patrols. The report is a single local television account, and the claims in it are the tenants' and officials' own statements.
WHAT TENANTS TOLD THE BOARD
Tenants described long gaps between reporting a problem and seeing it fixed. Carol Kelley said she filed a complaint about a hole in her bedroom ceiling in 2013 and that BMHA did not come to fill it until 2023. Curtis Jones Jr., who has lived at Holling Homes for nine years, said conditions have not improved in that time and that, in his words, nothing has been done since he moved in.
Kim McManus said tenants want a union because they have rights and those rights are not being acknowledged. Washington said tenants across Buffalo have been speaking out for more than 30 years about the issues at BMHA and have not been heard. He also said tenants hear the authority describe how it spends money on tenants but do not see the benefits.
Safety was a second theme. One woman told the station she was scared to leave her apartment to get her mail. Catherine Parks echoed those concerns and said tenants need police to be around more often. These are personal accounts offered at a public meeting. NSPIRE Wire has not verified the specific repair dates or incidents.
HOW THE AUTHORITY RESPONDED
WKBW spoke with BMHA's chair, Rachelle Satchell-Robinson, about the long wait times tenants described. She said she wants to have tenants come back and say a problem was taken care of or fixed, and that the authority has to figure out where the problem is. She did not, in the reporting, dispute the specific complaints.
The station reported that BMHA's 2026 annual report shows the authority spent about $12.8 million on maintenance. Satchell-Robinson said money goes to many things and that the authority is doing what it is supposed to do on maintenance. She also said two new Buffalo Police officers will patrol the properties to address safety concerns.
The report does not break down the $12.8 million by property or by type of work, and it does not say how many work orders were open or how long the typical repair takes. Those figures would show whether the experiences described at the meeting are isolated or common.
WHAT THE REPORT DOES NOT SAY
The station's story does not cite an inspection score for BMHA or for any development. It does not say whether HUD has reviewed the authority's repair backlog, and it does not report any enforcement action. It is a story about residents organizing and about what they told the board, not a story about an inspection finding.
That matters because public housing has its own federal measures. Under 24 CFR 5.711, public housing authorities are scored and ranked under the Public Housing Assessment System, which is set out in part 902 of HUD's regulations. Physical inspections under NSPIRE feed into that system. A resident's complaint about a ceiling is a work-order issue first, and it becomes an inspection issue when an inspector cites the condition or when a regulator reviews the authority's records.
HOW A WORK-ORDER BACKLOG CAN SHOW UP IN INSPECTIONS
An unrepaired hole in a ceiling can connect to several inspection categories, depending on its cause. A leak that has caused damage, mold or exposed wiring would be treated differently from a cosmetic crack. Under NSPIRE, deficiencies are classified as life-threatening, severe, moderate or low, as 24 CFR 5.705 describes. The most serious items must be corrected within 24 hours of notice. Moderate items must be corrected within 30 days and low items within 60 days, unless the standards or a HUD notice set a different time.
Inspections check a sample of units and common areas. A long list of old work orders does not itself appear in a score, but conditions that an inspector sees will. For that reason, tenant advocates often encourage residents to keep copies of repair requests and photographs, so they can show how long a problem has lasted if an inspector or HUD asks.
WHAT A TENANT UNION CAN AND CANNOT DO
A tenant union is a voluntary organization of residents. It can collect complaints, bring them to board meetings, request records, and speak to officials and the press. It can also help residents use formal channels, such as the authority's grievance procedure and complaints to HUD.
It does not have legal authority to order repairs or to change how the authority spends money. Those powers sit with the authority's board and management, with HUD as the federal oversight agency, and with the courts in a case brought by residents. A union can, however, make a pattern visible. When several tenants describe the same delay, the board has a harder time treating each case as an exception.
The WKBW report says tenants are trying to recruit more members. It does not say how many have joined, whether the union has filed formal demands, or whether it plans to seek meetings with HUD or elected officials.
THE ROLE OF THE BOARD
A housing authority board of commissioners sets policy and oversees the executive director. Residents attended the board meeting in Buffalo for that reason: it is the public forum where the authority reports on its work and where residents can speak. The chair's remarks suggest the board is aware of the complaints about wait times. What the board does next, such as asking for a work-order report or setting repair targets, will show whether the meeting changes practice.
Residents who want to follow up can ask the authority for its work-order policy, its target time for routine and emergency repairs, and the number of requests open longer than those targets. They can also ask for the board's meeting schedule and for how to place an item on the agenda.
WHAT RESIDENTS CAN DO NOW
Residents with a repair problem can submit the request in writing, keep a copy with the date, and take dated photographs. If the problem is not fixed, they can follow up in writing and ask for the status of the work order. Residents who believe a hazard is life-threatening, such as no heat in winter, a gas smell or a major leak near electrical equipment, should call the authority's emergency line and, when appropriate, local emergency services.
Public housing residents also have a formal grievance procedure for disputes with the authority, which NSPIRE Wire explained in a recent report. Residents can also contact the HUD field office that oversees their authority to report conditions. Tenant unions and legal aid organizations can help residents decide which route fits their situation.
WHAT TO WATCH
Three developments would add facts to this story. The first is whether BMHA or its board publishes repair-time figures or a plan in response to the meeting. The second is whether HUD comments on the authority's maintenance record or on any recent inspection results. The third is whether the tenant union grows and files formal requests or complaints.
Any of these would let readers move from personal accounts to documents. Until then, the report shows a group of residents describing long delays and an authority pointing to spending and new police patrols.
QUESTIONS FOR THE AUTHORITY
Residents and advocates who want to test the board's response can ask for specific numbers. How many work orders were open on the first day of each of the last twelve months? What is the average number of days to close a routine request and an emergency request? Which developments have the longest backlogs? What is the authority's target, and how often does it meet it? A written answer to those four questions would show whether delays like the ones described at the meeting are widespread.
They can also ask what the $12.8 million maintenance figure includes. Maintenance spending can cover staff, contractors, materials and unit turnover, and the mix matters. A large share spent on preparing vacant units for new tenants would mean something different for current residents than a large share spent on repairs in occupied homes.
SOURCES AND NOTES
This report relies on WKBW's November 19, 2026 report on BMHA tenants and the union effort. The station notes that the story was reported on air by a journalist and converted to its web platform with the assistance of AI, and says its editorial team verifies its reporting. Descriptions of public housing scoring and correction deadlines come from 24 CFR 5.705 and 5.711. Quotations and claims about conditions are the speakers' own and have not been independently verified by NSPIRE Wire.
Executive Summary
Tenants of the Buffalo Municipal Housing Authority are working to form a tenants union, WKBW reported on November 19, 2026.
They told the BMHA board at a Thursday meeting that repairs take years and that they feel unsafe. One tenant said a ceiling hole reported in 2013 was filled in 2023.
The authority's chair said she wants to find where delays occur. WKBW reports BMHA spent about $12.8 million on maintenance, and two new police officers will patrol properties.
The report cites no inspection score and no HUD action. Tenant and official statements are their own and are not independently verified.
Public housing is scored under HUD's Public Housing Assessment System, which draws on physical inspections under 24 CFR 5.711.
Source Verification & References (3)
NSPIRE Wire Editorial Desk
Editorial Desk
The NSPIRE Wire Editorial Desk publishes source-verified reporting and analysis covering HUD policy, NSPIRE inspections, affordable housing finance, development, transactions, and the people shaping the industry.
Related Coverage
More HUD Updates→
HUD Names New Regional Administrators for Southeast and Great Plains Regions
HUD announced on Nov. 20 that Secretary Scott Turner appointed Robert Myers as Regional Administrator for the Southeast Region (Region IV) and Fred Schuster as Regional Administrator for the Great Plains Region (Region VII). Region IV covers Alabama, Florida, Georgia, Kentucky, Mississippi, North Carolina, Puerto Rico, South Carolina, Tennessee and the U.S. Virgin Islands. Region VII covers Iowa, Kansas, Missouri and Nebraska. HUD's releases say Myers most recently served as a HUD deputy assistant secretary for strategic communications and Opportunity Zones, and Schuster spent more than three decades in public service, including regional director roles at the Department of Health and Human Services. The announcements came ten days after HUD's Nov. 10 notice of intent to reorganize its headquarters and field operating model. Summaries of that notice say the Office of Public and Indian Housing would eliminate its field and regional presence. HUD's releases do not connect the appointments to the reorganization or list the administrators' specific program duties. This brief relies on HUD's releases and outside summaries of the notice, not the full notice.

HUD Inspector General Posts Financial Statement Audit with No Opinion on Fiscal Year 2025 and Two FHA Control Weaknesses
The HUD Office of Inspector General posted report 2027-FO-0004 on Nov. 20. It is an audit of HUD's fiscal year 2026 and 2025 financial statements, performed by the accounting firm Sikich CPA LLC under contract. Sikich reported that HUD's financial statements for the year ended Sept. 30, 2026 are presented fairly in all material respects. It gave no opinion on the fiscal year 2025 comparative statements because management did not provide required written representations for that year. The audit also reported two material weaknesses in internal control over financial reporting related to the Federal Housing Administration, based on limited procedures, and no reportable noncompliance for fiscal year 2026. The inspector general says its own review is not an audit and expresses no opinion. The opinions are Sikich's. HUD's statements will appear in its Agency Financial Report, which had not been linked when the page was read. NSPIRE Wire read the inspector general's summary page and not the full report. It does not describe the specific weaknesses, dollar amounts or any management response.

East Greenwich Housing Authority Stops Issuing New Section 8 Vouchers and Uses Reserves to Cover Rent Gaps After Federal Cuts
The East Greenwich Housing Authority in Rhode Island has stopped issuing new Section 8 vouchers and is using reserves to cover rent gaps after federal funding cuts, its executive director told the Town Council on Nov. 23, according to Uprise RI. Executive Director Tracy Johnson said no vouchers have been terminated, but the authority usually issues three to five new vouchers a year and has been unable to. As people leave the program, their vouchers are not being reissued. Johnson said HUD lowered the rent figures for the coming year, to about $2,030 for a two-bedroom and $2,450 for a three-bedroom. She said most landlords are lowering rents, a couple are not, and the authority is covering those gaps from reserves. HUD's rule at 24 CFR 982.503 sets payment standards between 90 and 110 percent of fair market rent in the basic range. The report does not say which standard East Greenwich uses or how much of its reserves it has spent. The report is one outlet's summary of a public meeting, produced from the transcript with an LLM. NSPIRE Wire did not see the annual report or the recording.
HAVE A TIP ABOUT THIS STORY?
Know something we should know? Have documents, corrections, or related developments on this topic? Send an editorial tip to our reporters.